AER-TRN-01-P01 / CONCEPT DRAFT 1.0
Fictional inert trainer only; source/training reviewer approval required before training use. No operational aircraft, OEM, qualification, licence-credit or release authority.
Article AER-TRN-01 / lesson TRN-LRU-01. Human review is required.
| Step | Action | Expected evidence | Hold or limitation |
|---|---|---|---|
| 1 | Confirm the training article Read AER-TRN-01 and BAY-01; compare with the assigned lesson. | The article and source identify the same inert trainer. | A different or unreadable article ID means HOLD. |
| 2 | Freeze the lesson revision Use TRN-LRU-01 v2 teaching-cue concept; retain A permitted and B excluded. | The revision and allowed-unit list are recorded. | A missing source or changed list requires reviewer disposition. |
| 3 | Confirm an inert training setup The instructor establishes the permitted inert setup and supervised scope. This draft does not supply a real isolation procedure. | The reviewer has accepted the training conditions. | Do not apply this draft to energized equipment or an aircraft. |
| 4 | Review the support and access space Identify AP-01, its left hinge and R1/R2 with the support bed. | The intended model access and rail path are understood. | Missing support or an obstructed sweep means HOLD. |
| 5 | Identify and release D1 On the reviewed model, operate the upper catch D1. | D1 is visibly clear. | Do not infer a safe release from an occluded view. |
| 6 | Identify and release D2 Operate lower catch D2 before AP-01. | Both catches are visibly clear. | An engaged catch blocks the panel step. |
| 7 | Open AP-01 Use the source left-hinge direction to reveal the bay. | Panel-open reference state matches the named model. | Do not force another hinge direction or claim physical clearance from this viewer. |
| 8 | Identify P1 and J1 Distinguish the moving bay plug from the unit-fixed receptacle. | One plug and one receptacle are identified. | Ambiguous identity or source detail means HOLD. |
| 9 | Review separation and harness parking In a reviewed demonstration, separate the coupling and park the harness outside the rail path. | Coupling and parked-harness evidence are available. | A cable across the path blocks rail travel. |
| 10 | Review T1 and T2 Identify unit-mounted retainer cams and cabinet-fixed keepers. | The model/source shows the intended clear retainer state. | Unclear pivot, keeper contact or state requires review. |
| 11 | Inspect supported withdrawal Use the withdrawn GLB to inspect rail alignment and continuous support. | Both rails and the support bed remain part of the plan. | A static GLB is not proof that a physical movement was completed. |
| 12 | Record the checkpoint Record the named withdrawn state and any missing view before the configuration decision. | A reviewer can trace source, state and unresolved gaps. | The existing tray-transfer checkpoint is not a demonstrated continuous lateral lift. |