AER-TRN-01-P01 / CONCEPT DRAFT 1.0
Access and supported withdrawal
Make the source, access order and support path visible before changing the unit state.

Fictional inert trainer only; source/training reviewer approval required before training use. No operational aircraft, OEM, qualification, licence-credit or release authority.
Article AER-TRN-01 · lesson TRN-LRU-01 · concept draft 1.0 · source review required
- 01
Confirm the training article
Read AER-TRN-01 and BAY-01; compare with the assigned lesson.
- Expected evidence
- The article and source identify the same inert trainer.
- Hold / limitation
- A different or unreadable article ID means HOLD.
- 02
Freeze the lesson revision
Use TRN-LRU-01 v2 teaching-cue concept; retain A permitted and B excluded.
- Expected evidence
- The revision and allowed-unit list are recorded.
- Hold / limitation
- A missing source or changed list requires reviewer disposition.
- 03
Confirm an inert training setup
The instructor establishes the permitted inert setup and supervised scope. This draft does not supply a real isolation procedure.
- Expected evidence
- The reviewer has accepted the training conditions.
- Hold / limitation
- Do not apply this draft to energized equipment or an aircraft.
- 04
Review the support and access space
Identify AP-01, its left hinge and R1/R2 with the support bed.
- Expected evidence
- The intended model access and rail path are understood.
- Hold / limitation
- Missing support or an obstructed sweep means HOLD.
- 05
Identify and release D1
On the reviewed model, operate the upper catch D1.
- Expected evidence
- D1 is visibly clear.
- Hold / limitation
- Do not infer a safe release from an occluded view.
- 06
Identify and release D2
Operate lower catch D2 before AP-01.
- Expected evidence
- Both catches are visibly clear.
- Hold / limitation
- An engaged catch blocks the panel step.
- 07
Open AP-01
Use the source left-hinge direction to reveal the bay.
- Expected evidence
- Panel-open reference state matches the named model.
- Hold / limitation
- Do not force another hinge direction or claim physical clearance from this viewer.
- 08
Identify P1 and J1
Distinguish the moving bay plug from the unit-fixed receptacle.
- Expected evidence
- One plug and one receptacle are identified.
- Hold / limitation
- Ambiguous identity or source detail means HOLD.
- 09
Review separation and harness parking
In a reviewed demonstration, separate the coupling and park the harness outside the rail path.
- Expected evidence
- Coupling and parked-harness evidence are available.
- Hold / limitation
- A cable across the path blocks rail travel.
- 10
Review T1 and T2
Identify unit-mounted retainer cams and cabinet-fixed keepers.
- Expected evidence
- The model/source shows the intended clear retainer state.
- Hold / limitation
- Unclear pivot, keeper contact or state requires review.
- 11
Inspect supported withdrawal
Use the withdrawn GLB to inspect rail alignment and continuous support.
- Expected evidence
- Both rails and the support bed remain part of the plan.
- Hold / limitation
- A static GLB is not proof that a physical movement was completed.
- 12
Record the checkpoint
Record the named withdrawn state and any missing view before the configuration decision.
- Expected evidence
- A reviewer can trace source, state and unresolved gaps.
- Hold / limitation
- The existing tray-transfer checkpoint is not a demonstrated continuous lateral lift.